Lewden Electrical Industries was the
preferred supplier when a bespoke
feeder pillar distribution cabinet was
required for a project at the
University of Hertfordshire.
The installation was to provide
electrical powerLewden Electrical Industries was the
preferred supplier when a bespoke
feeder pillar distribution cabinet was
required for a project at the
University of Hertfordshire.
The installation was to provide
electrical power to student homes
within the University Campus. As
the original cast iron feeder pillars
housing the cables had corroded
severely over a period of years, this
had caused earth continuity
problems within the original
installation.
By undertaking a prompt site visit,
Lewden was able to meet with the
installers, Neocrest and jointly assess
and discuss the design requirements
for the four new identical pillars.
Subsequent drawing plans were
provided by Lewden for the heavy
duty galvanised steel cabinets, which
enabled the project to gain the
necessary approval and proceed
quickly with manufacture.