Kelly Rose
Editor

Power protected

Lewden Electrical Industries was the preferred supplier when a bespoke feeder pillar distribution cabinet was required for a project at the University of Hertfordshire. The installation was to provide electrical powerLewden Electrical Industries was the preferred supplier when a bespoke feeder pillar distribution cabinet was required for a project at the University of Hertfordshire.

The installation was to provide electrical power to student homes within the University Campus. As the original cast iron feeder pillars housing the cables had corroded severely over a period of years, this had caused earth continuity problems within the original installation.

By undertaking a prompt site visit, Lewden was able to meet with the installers, Neocrest and jointly assess and discuss the design requirements for the four new identical pillars.

Subsequent drawing plans were provided by Lewden for the heavy duty galvanised steel cabinets, which enabled the project to gain the necessary approval and proceed quickly with manufacture.
Power protected
Power protected
Company Info

Lewden Electrical Industries (Lewden Palazzoli)

Unit 4 Bradbury Drive
Springwood Ind Estate
Briantree
E10 7QD
UNITED KINGDOM

01376 3360200

sales@lewden.co.uk

www.lewden.co.uk

Login / Sign up